Jello-Mud References


Shield Lubrication and Settlement Control

8.7m x 9.9m STEC EPB Pipe-Jacker

Shanghai Jing’an Temple Pipe-Jacking Project

Project Year: 2019

Φ 11.66m KOMATSU EPB TBM

Shanghai Longshui South Rd River-Crossing Project

Project Year: 2022

Φ 6.69m STEC EPB TBM

Singapore Changi Airport T316 Project

Project Year: 2024


TBM Launch and Receiving in Water-Rich Strata

Φ 11.85m CRCHI EPB TBM

Shenzhen Shenjiang Railroad SJSG-3 Tunnel Project

Project Year: 2024

Φ 11.64m CRCHI Slurry-Shield TBM

Nanjing Subway Line 4 Yangtze River-Crossing Project

Project Year: 2024

Φ 4.91m KOMATSU Slurry-Shield TBM

Shanghai Taopu Waster Water Treatment Plant Tunnel Project

Project Year: 2024


TBM Chamber Pressure Buildup and Maintain

Φ 14.57m CRCHI Slurry-Shield TBM

Ningbo Jintang Ocean-crossing Tunnel Project

Project Year: 2024

Φ 9.13m CRCHI Duo Mode Slurry/EPB TBM

Shenzhen Shenda Railroad T4 Tunnel Project

Project Year: 2024

Φ 15.1m Herrenknecht VSM Depth: 29.03m

Shanghai Yingbin Water Plant Project

Project Year: 2024

7.63m x 6.43m STEC EPB Pipe-Jacker

Singapore N109A Pipe-Jacking Project

Project year: 2024

Φ 9m CRCHI Slurry-Shield TBM

Shanghai PVG Airport JCXSG-13 Project

Project Year: 2024

Φ 11.76m CCCC EPB TBM

Guangzhou CAN Airport Tunnel Project

Project Year: 2024

Φ 6.28m CREG EPB TBM

Nanchang Subway Line 2 Tunnel Project

Project Year: 2023

Φ8.8m CRCHI EPB TBM

Guangzhou Guanghua River-crossing Tunnel Project

Project Year: 2024


Annular Ring Formation

Φ 8.7m STEC ACPP Depth: 31.5m

Shanghai Subway Line 13 Extension Project

Project Year: 2023